Main activities

Clearing of territories and their preparation for building

Clearing of territories and their preparation for building

Construction of buildings and constructions I and II levels of responsibility
• Civil works
– Preparatory work
Clearing of territories and their preparation for building
Construction of temporary roads, engineering networks and constructions

Implementation of the general contractor
• Plumbing
– Work on installation of external engineering networks and communications
Installation of heating systems with water temperature to 115 degrees. Celsius (including polymeric materials)
Laying water networks (including polymeric materials)
Laying sewer networks (including polymeric materials)
• Special works
– Special works in soils
– Piling works
– Installation of steel structures
– Protection of constructions, technological equipment and pipelines
• Work-related increased risk of industrial plants and facilities
Trunk gas, oil, product
Gas facilities:
– External gas pipelines cities, towns and villages (including inter-settlement)
– Gas control points and installation
– Pipelines and gas equipment of industrial, agricultural and other enterprises using
Natural gas (gas and oil fields) with overpressure of 1.2 MPa (12 kgf / cm) and liquefied petroleum gas with an excess pressure of not more than 1.6 MPa (16 kgf / cm²) as a fuel
• Installation of the process equipment
• Commissioning works
• Supply and installation of elastic polymer tanks PED-200AN with a set pressure-suction hoses, connecting and valves for the storage of light oil field in the Arctic climate zone
• Design and research, laboratory testing, development of design and technological documentation, manufacture of equipment for contact butt welding (KSSO)
• Commissioning and maintenance welding systems of domestic and foreign manufacturers in the field and steady-state conditions